Solar Electric Photovoltaic (PV) system on my roof

Components as installed by MC Solar Engineering

Contract signed on 12/28/1999. System was spinning the meter backwards feeding power into the grid on 3/1/2000. About two months total and we weren't even trying to do it fast. Try getting a utility scale power plant designed, approved, permitted, built and online in two months time! :-) Conventional power plants take several years from project start to operation IF things go smoothly.

[home]

m.t.thompson@ieee.org